It's so annoying to drive on bumpy uneven roads! It's unbelievable how contractors and subcontractors of Manila Water Works managed to do such a measly job. Fine! The ongoing (close to 2 years now) excavation and lining up of water line in various parts of Metro Manila is a step to improve the water supply system but! the traffic that they effected was and is terrible! The safety measures they take are not effective as I've heard stories of people and motorcycles falling in the excavations. When a certain junction is done, the way they fill-in and patch the road is so unprofessional that the once even and smooth roads are now patchy and uneven.
On the bright side, I noticed that their equipment are of the high quality as I noticed that they were using a gusher pump for siphoning out water from one of their excavations. It's summer time once again. I just hope that at the end of the season all "improvements" on the water distribution system will be done.
On the bright side, I noticed that their equipment are of the high quality as I noticed that they were using a gusher pump for siphoning out water from one of their excavations. It's summer time once again. I just hope that at the end of the season all "improvements" on the water distribution system will be done.
0 special thoughts:
Post a Comment